- Single point locking release
- Adjustable locking ladders for perfect levelling
- PEAK’s exclusive hidden safety locks
- Foldable Ramps
- oil and floor bolts included
- Double S shape columns
- Optional jacking beam
- Optional storage wave panels
-
Model 409-DP
|
|
Double Parking 4 post lift
|
Lifting Capacity
|
|
4000kg(9,000lbs)
|
Lifting Time
|
|
47s
|
Overall Length (Inc Ramps)
|
A
|
5359mm (211")
|
Outside edge of crossbeams
|
B
|
4332mm (170 9/16")
|
Overall Width
|
C
|
5040mm (198 7/16")
|
Width Between Columns
|
D
|
4798mm (188 7/8")
|
Drive Through Width
|
E
|
4514mm (177 3/4")
|
Overall Height
|
F
|
2105mm (82 7/8")
|
Minimum Height
|
G
|
155mm (6 1/8")
|
Max. Lifting Height
|
H
|
1872mm (73 11/16")
|
Max. lock height to top of runway
|
1802mm (70 15/16")
|
Max. height underneath runway
|
I
|
1772mm (69 3/4")
|
Max. lock height underneath runway
|
1702mm (67")
|
Width Between Runways
|
J
|
940mm (37")
|
Overall width of single parking unit
|
K
|
1890mm (74 7/16")
|
Width Between two parking units
|
L
|
550mm (21 5 /8”)
|
Gross Weight
|
|
1275kg(2,810lbs)
|
Motor
|
|
3.0HP
|
Peak Warranty conditions from 01-06-2022
- Steel structure components including Columns, Carriage, Lifting Arms, Top Beam, Floor Cover, Platform, Cross Beam, Car Drive-in Ramp, Scissor, Base frame etc warranty for FIVE YEARS.
- Hydraulic parts including cylinders, oil seal, oil hose, fitting etc warranty for TWO YEARS.
- Other parts electrical components, power unit (not including normal wear & tear/consumable parts such as rubber pad), warranty for TWO YEARS.
- 4 Post parking lifts warranty as above when installed as a home workshop or parking lift. Not in commercial workshop use environment.
We send out all lifts via a freight company and are delivered on a standard curtain-sider truck.
You need a forklift, or access to one to unload the truck.
We can arrange a Hiab delivery in most locations if required for an extra charge. Please ask if needed
Normal delivery times :
Auckland: 1-2 days
Rest of North Island: 2-3 Days
South Island: 4-5 days (ex Auckland) 1-2 days (Ex Chch)