- Single point locking release
- Adjustable locking ladders for perfect levelling
- PEAK’s exclusive hidden safety locks
- Install the control power side column on any corner
- Folding ramps easily removed for storage
- Jack tray included
- 4 x Drip trays come as standard
- oil and floor bolts included
- Double S shape columns
- Optional Caster kit
- Optional jacking beam
- Optional center storage wave panels
Model 407-P
|
|
4-Post Parking Lift
|
Lifting Capacity
|
|
3000kg(6,600lbs)
|
Lifting Time
|
|
31s
|
Overall Length (Inc Ramps)
|
A
|
4720mm (185 7/8")
|
Outside edge of crossbeams
|
B
|
3700mm (145 11/16")
|
Overall Width
|
C
|
2409mm (94 7/8")
|
Width Between Posts
|
D
|
2167mm (85 3/8")
|
Max.Lifting Height
|
E
|
1872mm (73 3/4")
|
Max locking height
|
1792mm (70 9/16")
|
Overall Height
|
F
|
2105mm (82 7/8")
|
Minimum Height
|
G
|
135mm (5 3/8")
|
Max.Underneath Height
|
H
|
1772mm (69 3/4")
|
Max. Lock Underneath runway
|
1692mm (66 5/8")
|
Drive-Thru Clearance
|
I
|
1956mm(77")
|
Width Between Runways
|
J
|
940mm (37")
|
Outside Edge of Runways
|
K
|
1890mm(74 3/8")
|
Gross Weight
|
|
654kg
|
Motor
|
|
3.0HP
|

Peak Warranty conditions from 01-06-2022
- Steel structure components including Columns, Carriage, Lifting Arms, Top Beam, Floor Cover, Platform, Cross Beam, Car Drive-in Ramp, Scissor, Base frame etc warranty for FIVE YEARS.
- Hydraulic parts including cylinders, oil seal, oil hose, fitting etc warranty for TWO YEARS.
- Other parts electrical components, power unit (not including normal wear & tear/consumable parts such as rubber pad), warranty for TWO YEARS.
- 4 Post parking lifts warranty as above when installed as a home workshop or parking lift. Not in commercial workshop use environment.
We send out all lifts via a freight company and are delivered on a standard curtain-sider truck.
You need a forklift, or access to one to unload the truck.
We can arrange a Hiab delivery in most locations if required for an extra charge. Please ask if needed
Normal delivery times :
Auckland: 1-2 days
Rest of North Island: 2-3 Days
South Island: 4-5 days (ex Auckland) 1-2 days (Ex Chch)