- Peak models: 407-P / 407-HP / 408-P / 408-HP require 1 set.
- Peak models: 409-DP / 409-DPX require 2 sets.
Compatible with
407-P / 407-HP / 408-P / 408-HP / 409-DP / 409-DPX
We ship all heavy equipment by freight truck and most accessories/spare parts by courier.
Most lifts are delivered on a curtain-sider truck (which may require a forklift to unload), while most tyre changers and balancers are delivered on a tail-lifter truck.
If you don’t have one, we can arrange a HIAB delivery for an additional cost.
We can also arrange installation on request.
Estimated delivery times:
-
Auckland: 1–2 days
-
Rest of North Island: 2–3 days
-
South Island: 4–5 days (ex AKL) / 1–2 days (ex CHC)
For special delivery requirements, just contact us.



